Fully insured|$2M general liability|Established 2019
Mon–Sat 7am–6pm|(321) 468-6087
SaxtonEarthworks Request a Quote

What it costs

Most outfits in this market won’t publish a number. Here are ours. The per-acre ranges, three worked examples with the actual math, and a straight explanation of what pushes a job to the top or the bottom of a range.

$1,200Lightest mulching
per acre
$4,500Heaviest mulching
per acre
$0Deposit
to book
24hrQuote
turnaround
The rates

Per acre, by density

Density drives the price far more than acreage does. Ten acres of palmetto is a quicker job than two acres of hammock, and it prices that way.

How thick is it?Mulching / acreClearing / acre
Light
Palmetto, grass and scattered saplings under 4" DBH. You can walk it now.
$1,200–2,500$1,500–3,000
Moderate
Mixed brush and pine, 4–8" DBH. Continuous cover, hard going on foot.
$2,500–3,500$3,000–6,000
Heavy
Dense oak hammock, 8–10" DBH, tight canopy and heavy understory.
$3,500–4,500$6,000–10,000

Which column applies to you

Mulching grinds everything where it stands and leaves the chips down. The root mass stays. Right for land you want usable and maintained.

Clearing takes the roots out and leaves bare soil, plus material that has to go somewhere. Right for anything you’re building on.

Not sure? The services page has a side-by-side, or send photos and we’ll tell you which one the property actually needs.

Worked examples

Three real shapes of job

Numbers on their own don’t mean much. Here’s how three typical jobs actually price out, and why two of them land on the same total from very different ground.

2.5 acres, Titusville

Worked example

Overgrown residential lot, palmetto and scattered slash pine, most under 4 inches. Truck and trailer straight off the road.

DensityLight
Rate applied$1,600/acre
Time on site1 day
Total$4,000
Light density, easy access and no haul-off. This is about as cheap as clearing gets in this market.

1 acre, DeLand

Worked example

Oak hammock behind an existing house, 8–10 inch trunks, machine walked in 300 feet through a side gate.

DensityHeavy
Rate applied$4,200/acre
Time on site2 days
Total$4,200
Same total as the 2.5-acre job above, on 40% of the ground. Density and access are the whole story.

Driveway, north Brevard

Worked example

120 feet of new shell drive from the road to a build site, culvert set at the ditch, base compacted.

PricedPer job
MaterialsShell and base, hauled in
Time on site2 days
TotalQuoted. Ask
Driveways don’t take a per-acre rate. Haul distance to the pit and what the ditch needs move this number more than the length does.
The variables

What moves you within a range

Every quote sits somewhere between the two numbers in that table. These are what decide where.

  • Trunk diameterThe single biggest factor. A mulcher eats 4-inch pine all day; 10-inch oak is slow, hard on the head, and sometimes needs a second pass.
  • How continuous it isScattered growth over open ground is fast. Wall-to-wall cover with no room to turn is not.
  • AccessBacking a trailer to the work is cheap. Walking a machine several hundred feet through a gate, or working around a well head and an irrigation line, is not.
  • Ground conditionDry sand is ideal. Soft ground, a high water table or a wet season slows everything and occasionally stops it.
  • What you want leftMulch down is the base price. Roots out, raked, and hauled off is two to four times that.
  • TripGetting truck, trailer and machine to you and back costs the same whether the job is one day or five. It’s why a half-acre costs more per acre than ten acres.

And what doesn’t move it:

  • How urgent it is. We don’t price up rush jobs. If we can fit you in, the number is the number.
  • What the property is worth. We’re pricing machine hours, not your zip code.
  • Whether you got another quote. We’d rather explain our number than shave it.

If a quote you’ve been given is far below this page, that’s worth a question rather than a celebration. Ask what happens to the material, whether stumps are included, and whether the price is per acre or per day.

Get a number for your property

A warning

Why online calculators lowball Florida

Nearly every cost-estimator site quotes a national average. Central Florida isn’t the national average, and the gap isn’t a markup.

National cost sites put a skid steer mulcher at $1,000–$2,500 a day. Real operators in this market start around $3,000 with transport, and there are three honest reasons for it.

Palmetto root mass. Saw palmetto is the default understory across most of this footprint. It’s dense, it’s fibrous, and it’s hard on a mulching head in a way that midwestern brush isn’t. It also regrows, which is why we tell people up front that mulching is maintenance rather than a cure.

Trip distance. Parcels here are spread across five counties with a lot of empty road between them. A national average assumes a denser work radius than any Florida operator actually has.

Ground and season. Soft ground and a high water table for several months of the year change what a machine can do per hour. Nobody averaging across fifty states is modelling a Florida wet season.

None of that makes the national number dishonest. It makes it irrelevant here, and quoting against it’s how people end up with a contractor who has to find the difference somewhere else.

What’s always included

  • Transport of machines to site and back
  • Fuel and operator
  • A walk-through with you before we leave
  • Cleanup of anything we dragged onto the road

What’s quoted separately

  • Haul-off and disposal of material
  • Stump grinding below grade
  • Imported fill, shell or base rock
  • Permits, surveys and engineering. Owner’s responsibility
FAQ

Questions about cost

The ones that come up on nearly every call.

Is that price per acre or for the whole job?

Per acre, for mulching and clearing. A two-acre job at $2,000 an acre is $4,000. Below about half an acre the per-acre logic stops working. Trip is a fixed cost, so very small jobs carry a minimum. We’ll tell you the minimum when we quote rather than quietly inflating the acre rate.

Why is the range so wide?

Because the difference between light palmetto and heavy oak hammock is that big, and quoting a single number for both would mean overcharging half our customers. Once we’ve seen photos the range we give you is tight. Usually a few hundred dollars wide, not thousands.

Do you charge by the hour or by the day?

We quote the job. Day rates suit the contractor and hourly rates suit the contractor even more. A fixed number for a defined scope is the only arrangement where our incentive to work efficiently matches yours.

What if it takes longer than you thought?

That’s our problem, not yours. If we quoted it, we wear the estimate. The only time a price changes is if we find something materially different from the photos, and then we stop and talk to you before continuing rather than adjusting the invoice afterwards.

Do you require a deposit?

No. You pay when the work is finished and you’ve walked it with us.

Do you offer any discounts?

Not as a policy, but two things reduce the number: combining several jobs into one trip, and flexibility on timing so we can slot you next to other work in your area. Both save us real cost, so both come off the price.

Send photos. Get a number.

Most quotes come back the same day. No deposit, and the price we agree on is the price you pay.

Request a quote →